So long Solent - Solent Gas Transits

LMR Drilling UK Ltd. has recently completed the installation of 2 no. 324 mm dia. steel pipelines which were installed through separate holes some 50 m below the bed of the Solent using the Horizontal Directional Drilling (HDD) technique. Each crossing, at 3,930 m length is believed to be some 20% longer than any previously completed using HDD. Despite the significant challenges the crossings presented, the project was completed on schedule and budget and to the great satisfaction of all concerned. more right arrow