Media

Marsdiep crossing between Den Helder and Texel (05/2017)
Running time 3 min.
view up right arrow
Bauvorhaben Berlin Köpenik (11/2014)
Unterquerung der Müggelspree
Laufzeit ca. 7 min.
view up right arrow
Underwater discharge tunnel in San Cibrao (07/2014)
Video provided by CONSTRUCTORA SAN JOSE S.A.
view up right arrow
Repositioning the Rig (09/2012)
Time lapse, running time ca. 6 min.
view up right arrow
Wadden Sea Construction Site (07/2011)
How does offshore engery reach our homes?
Runningtime: ca. 30 min.
view up right arrow
LMR in action (04/2011)
Running time 2.5 min.
view up right arrow